The Brentwood Bridge

 


 The longest single span precast bridge designed and constructed for the Melbourne City Link Project was the Brentwood Bridge spanning 42 metres and weighing 145 tonnes. Manufacture was completed at our Laverton factory, the bridge was transported to site by a transporter with the overall length of the load being 80 metres.

 

Images

Top: The Brentwood Bridge in place
Bottom: The Production team, with the bridge ready for transportation to site

Brentwood Construction Team