Click on an image to enlarge   | The Brentwood Bridge The longest single span precast bridge designed and constructed for the Melbourne City Link Project was the Brentwood Bridge spanning 42 metres and weighing 145 tonnes. Manufacture was completed at our Laverton plant, the bridge was transported to site by a transporter with the overall length of the load being 80 metres. Images Top: The Brentwood Bridge in place Bottom: The Production team, with the bridge ready for transportation to site | |